Renova Solar Installation of the Month for October!

  • Lea Goodsell
  • Vice President of Business Development & Branding

The Renova Solar Installation for the Month of October is a beautiful 13.00kW system. This system is located in Palm Springs and has an expected offset of  20,991 kWh, and expected carbon offset of 832,232 lbs! The Renova Solar crew leader for this solar installation was Ruben Garcia. Another beautiful Renova Solar system in the beautiful Coachella Valley!

 

Related Renova Energy Insights:

Renova Energy One of the Top Solar Companies in the Country Once Again

read more

With Summer Almost Over, Is It Too Late to Save with Solar?

read more

Fortune 500 CFO Joins Renova Energy to Help Guide Next Phase of Solar and Battery Storage Growth

read more

Are Solar Batteries Good for Energy Storage and Savings?

read more